 |
For your viewing convenience, the
following items are available in PDF format.
Engineering and Operations
Study Plans
-
SP-E1 Model Development,
(October 25, 2002) (862KB)
-
SP-E1.1 Statewide Operations Model
Development,
(October 25, 2002)
(615KB)
-
SP-E1.2 Local Operations Model Development, (October
25, 2002) (75KB)
-
SP-E1.3 Oroville Reservoir Temperature Model
Development, (October 25, 2002
) (816KB)
-
SP-E1.4 Thermalito Complex Temperature Model
Development, (October 25, 2002)
(54KB)
-
SP-E1.5 Feather River Temperature Model
Development, (October 25, 2002)
(127KB)
-
SP-E1.6 Feather River Flow-Stage Model
Development, (October 25, 2002)
(236KB)
-
SP-E2 Perform Modeling Simulations
(October
25, 2002) (192KB
File Size)
-
SP-E3 Evaluate the Potential for Additional
Hydropower Generation at Oroville, (October 25, 2002)
(344KB File Size)
-
SP-E4 Flood Management Study, (October 25, 2002)
(300KB)
-
SP-E6 Downstream Extent of Reasonable Control
of Feather River Temperature by Oroville-Thermalito,
(October 25, 2002) (239KB)
-
SP-E7
Oroville Reservoir Cold Water Pool Evaluation
(October 25, 2002) (105KB File Size)
-
SP-E8 Temperature4 Impacts of Pumpback Operation
on Oroville Reservoir Cold Water Pool
(October 25, 2002) (223KB File
Size)
Viewing Notes
In order to view these online "pdf"
files, you need to use Adobe Acrobat Reader software. Some Web
browsers may already incorporate PDF viewers or plug-ins.
If you don't have this software, the latest
version is available for free downloading at the Adobe
Systems, Inc. Web Site. Be sure to
integrate the Acrobat Reader software into your Web browser for best
results.
|